Step-by-Step Guide: How to Install Schluter Heated Floor
Installing a Schluter heated floor system can greatly enhance your living or working space, providing a comfortable, even warmth that radiates up from the floor. This system, also known as in-floor heating or radiant floor heating, works by circulating hot water through PEX pipes embedded in a special compound poured over your subfloor. Here's a comprehensive guide to help you through the process, from preparation to testing your newly installed heated floor.
Before diving in, ensure you're well-versed with local building codes and obtain any necessary permits. If you're unsure, consult with a professional. Now, let's get started with the preparation phase.
Preparation
Preparing the site is crucial for a successful installation. Start by ensuring your subfloor is clean, dry, and structurally sound. Any defects should be repaired before proceeding.
Next, plan your pipe layout. Schluter offers design tools to help you determine the optimal pipe spacing, based on factors like floor thickness, insulation, and desired temperature. Order the necessary Schluter components, including theKERDI-BOARD subfloor panel, underfloor heating system, and any required accessories.
Fitting Your Space
Measure your room accurately to determine the total area you need to cover. Schluter KERDI-BOARD panels come in standard sizes, so you'll need to account for any cuts and overlaps. Don't forget to allow for expansion joints and any obstacles like closets or staircases.
Plan your manifold location. The manifold is where the water supply and return lines connect. It should be easily accessible for future maintenance and preferably in a living area, not a crawlspace or basement.
Gathering Tools and Materials
Beyond the Schluter system components, you'll need various other tools and materials. These include a saw for cutting panels, aLeveler for ensuring a smooth subfloor, a trowel for applying mortar, a pump for mixing and pouring the compound, and a suitable withe PEX glue for joining pipes.
Also, gather safety gear like gloves, safety glasses, and knee pads. Consider having a helper for some tasks, like mixing and pouring the compound.
Installing KERDI-BOARD Panels
Once prepared, you can begin installing the KERDI-BOARD panels, which serve as both your subfloor and the integral part of the heating system that holds the PEX pipes in place.
Start from one corner of the room, laying full panels first and then trimming to fit as you approach the walls. Use a sharp utility knife to score and snap the panels to size. Apply a thin layer of Schluter KERDI-FUG mortar between panels, ensuring a solid bond and even plane.
Laying Out PEX Pipes
Using your planned layout, mark where your PEX pipes will go. Ensure they're spaced evenly and follow a parallel path, with loops at the ends to allow for thermal expansion.
Lay out the PEX manifolds and branch lines, then route the pipes accordingly. Use Schluter KERDI-ROCK pins to secure the pipes as you go. Ensure the supply and return lines connect properly at the manifold.
Pouring the Self-Levelling Compound
Mix the self-levelling compound according to the manufacturer's instructions. It's typically a fast-setting, high-strength formula that encapsulates the PEX pipes, providing even heat distribution and protecting the pipes.
Pour the compound over the KERDI-BOARD panels and PEX pipes, ensuring they're completely covered. Use a Leveler to ensure an even surface. Allow it to cure according to the manufacturer's instructions before proceeding.
Connecting to the Heating System
Once the compound has cured, you can connect your new underfloor heating system to your existing plumbing. If you don't have a plumbed heating system already, you may need to install one. This could involve radiators, a boiler, or (“in some cases”) even a heat pump.
Connect the supply and return lines from your manifold to your heating system's inlet and outlet respectively. Pressure test the system to ensure there are no leaks. Bleed the pipes to remove any trapped air.
Testing Your System
Prepare a temporary system commissioning kit. This allows you to pump hot water through the PEX pipes to test your system. Follow the manufacturer's instructions carefully to avoid damaging the pipes.
Once tested and all is working as expected, you can drain the commissioning kit, close the system up, and prepare for final installation of your finished floor covering.
With your Schluter heated floor now installed and tested, you're ready to move on to the final stages of your project. Enjoy the warmth and comfort that your new radiant floor heating system provides. Regularly maintain your system to keep it running efficiently and safely, ensuring many years of service.